Christine Haldenberg
Managing Director
Commercial management, HR
We are a mid-sized gearbox manufacturer with 168 employees in Aalen, Germany. No group, no holding — the shareholders work in the building.
It started in 1958 in a workshop on Haldenberger Strasse: Wilhelm Haldenberg turned parts for the region's machine tool builders. That it became a gearbox manufacturer came down to a complaint — in 1969 a customer brought back a bought-in gearbox whose backlash had drifted after eight weeks.
Two years later we shipped our first own planetary gearbox. The standard has not changed since: build gearboxes that still reach the same position after years of three-shift operation as they did on day one. What has changed is how much we make ourselves — gear cutting, heat treatment, grinding and the metrology lab are all in-house today.
Wilhelm Haldenberg starts with three lathes and two employees.
Two-stage, for a rotary indexing machine in Schwäbisch Gmünd. That gearbox ran until 2004.
An end to four-week waits at the contract hardener — and to batches whose distortion nobody could explain.
Ingrid and Peter Haldenberg take over the management.
First profile grinding machine. From here, DIN quality 5 becomes the series standard.
Helical and preloaded — the answer to axes that have to stay below one arcminute.
Christine and Matthias Haldenberg join the management.
1,900 m², held at 20 °C, with six test benches in final assembly.
Four people you can also reach personally, if it comes to that.
Managing Director
Commercial management, HR
Managing Director, Technical
Engineering, production
Head of Application Engineering
Sizing, special designs
Head of Quality Management
QM, metrology, audits
One plant, not scattered locations. When you call, you speak to the department that builds the gearbox. Visits and audits are possible at any time by arrangement.
HALDENBERG Antriebstechnik GmbHHaldenberger Strasse 1273431 AalenGermanyOf our 168 employees, 51 did their apprenticeship here. Whoever starts with us is standing at a machine after two weeks, not at the photocopier.
Send a speculative applicationCovers 41 % of annual electricity demand. The heat treatment shop runs preferentially around midday.
Heats assembly and administration. Gas consumption is down 58 % since 2019.
Central reconditioning instead of individual tanks — 71 % less fresh mix per year.
A works visit here is not a marketing appointment. Bring your drawing.